Requirement :
|
Construction Of Composite Gravity Dam On River Kadan Of Gross Capacity Of 42.66 Mcm On Turnkey Basis Comprising Of Concrete Overflow, Non-Overflow Blocks, Earthen Main And Subsidiary Dam,Intakewell At Subsidiary Bund Bridge On Spillchannel Including Survey, Geological Investigations, Land Acquisition Award Approval From Competant Authority Of Submitted L A Cases For Land Acquisition Of Dam Seat And Submergence Area, Including Property Survey, Planning, Design, Estimation, Preparation Of Construction Drawings And Construction Of Concrete Dam Which Includes Ogee Spillway With Surplussing Arrangement And Radial Gates With Hoisting Arrangements And Energy Dissipation Arrangement, Gantry Crane, Stop Log Arrangements, Inspection And Deck Slab Bridge Etc. Sluice In Dam With All Hoisting Arrangements And Obtaining Approval Of All Construction Drawings From The Competent Authority Including Construction Of All Civil, Mechanical And Electrical Works Involved In The Construction Of Composite Dam As Per Approved Drawings, Including River Diversion And Construction Of Coffer Dams,All Gates Automation In Composite Gravity Concrete Dam Including Operation And Maintenance For Three Years After Completion Of The Project, Model Study Of The Project And As Directed By The Engineer-In- Charge As Per Details Given In Scope Of Work
|