Pre-Qualification : |
MSE Exemption for Years of Experience and Turnover : No Startup Exemption for Years of Experience and Turnover : No Document required from seller : Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Past Performance : 20 %
|
Requirement :
|
Supply of Flanges 1 3 8 Ods, Needle Valve, Capscrew Socket Head M16x2.0x50mm, Gauge Oil Pressure, Bearing Cap, Starter for He D2 2.2kw Dol, Thermo Regulating Valve, Defrosting Control Sensor, Feeler Pocked, Power Contactor 115 Vac, Air Contactor, High and Low Pressure Relay P78, Room Thermostat, Nipple with Coupling, Oil Filter Cartridge, Power Contactor 115vac, Xjf 151 N New Screw Compressor, Extension, Gasket for Capacitor, Purging Valve, Slide Valve Indicating Mechanism (microprocessor), Piston Stepper, Cover Seal Housing, Coolant Water Pump Shaft Packing, Shutoff Valve, Relay, Capscrew Socket Head M12x1.25 X40mm, Discharge Line Thermometer 0 120 C, Piston Slide Valve, Heat Exchanger, Anti Freeze Thermostat, Thermometer, Shaft Seal Chilled Water Pump, Plug High Vi Liquide Injection, Jackshaft, Timing Relay 115v 2w, Chock Mount, Oil Difference Pressure Switch, Crank Shaft, Glas, Bearing, Capscrew Hex Head M24x3.0 X65mm, Temperature Sensor of a Cooling Room, Capscrew Socket Head M8x30 Qty 746
|