Pre-Qualification : |
Minimum Average Annual Turnover of the bidder (For 3 Years) (3 ) : 50 Lakh (s) Years of Past Experience Required for same similar service : 1 Year (s) MSE Exemption for Years of Experience and Turnover : No Startup Exemption for Years of Experience and Turnover : No Document required from seller : Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Past Performance : 10 %
|
Requirement :
|
Supply of Equipment's Physics Department, Equipment's Chemistry Department, Smart Class, List of Chemistry Books, List of Physics Books, Flashing & Quenching of Neon Bulb, Study of Basic Logic Gates, Searle’s Apparatus, Four Probe Experiment, Polaris Meter Tube (to Find Specific Rotation of Sugar), Study of Hybrid Parameter of Transistor, Variation of Magnetio Field Along the Axis of Single Coil, Characteristics of Mosfet, Study and Verification of Nand Gate and Use as Universal Gate Using Ttlic7400, Hot Air Oven (24 X 24) Inch (45 Lt.), Centrifuge Machine (r-303), Water Distillation Plant [3000 Ml Capacity Single State Distillation Plant] , Heating Mentle 1000 Ml, Melting Point Apparatus, Distillation Assembly with 500 Ml Flask (borosilicate Glass), Cintered Glass, Crucible (ordinary) 100 , Burette (borosilicate Glass) (50 Ml), Beaker (borosilicate Glass) (250 Ml), Tlc Chamber (9 X 9 X 5”), Hot Plate with Stirrers (2 Lt.), Water Jet Pump, Filtration Flask (1000 Ml). Qty 5, Interactive Panel, Audio Podium, Wall Mount Speaker , Invertors, Faculty Chair (without Revolving) , Faculty Table, Laptop (i-5) Dell , Curtains , Hdmi Cable, Touch Cable/wave Cable with Espresso , Projector.
|