Pre-Qualification : |
Minimum Average Annual Turnover of the bidder (For 3 Years) (3 ) : 404 Lakh (s) OEM Average Turnover (Last 3 Years) ( 3 ) : 5393 Lakh (s) Years of Past Experience Required for same similar service : 3 Year (s) MSE Exemption for Years Of Experience and Turnover : Yes Startup Exemption for Years Of Experience and Turnover : Yes Document required from seller : Experience Criteria,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Additional Doc 3 (Requested in ATC),Additional Doc 4 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
|
Requirement :
|
Supply Installation Testing Commission Modular 200 Kva N Plus 1 Ups with 30 Min Battery Back Up as Per Technical Specification Drawings, Sitc Modular 50 Kva N Plus 1 Ups with 30 Min Battery Back Up as Per Technical Specification Drawings, Supply Installation Testing Contract 10kva Ups with Inbuilt Isolation Transformer 30 Min Battery Backup as Per Technical Specification Drawings, K13 Isolation Transformer 220 Kva 3ph Minus 1ph Along with All Accessories, K13 Isolation Transformer 55 Kva 3ph Minus 1ph Along with All Accessories, Sitc of Wall Mount Db with Associated Monitoring Modules, Sitc of Static Switch, Sitc of Requisite It Infrastructure Administrative Laptop Monitoring Display as Per Technical Specifications, Sitc of Conventional Copper Earthing System Along with All Necessary Installation Accessories, as Per Technical Specifications, Sitc of Pure Copper Strip 25mm By 3 Mm as Per Technical Specifications, Sitc of 9percent Pure Pvc Insulated Copper Cable of 50mm Square Cross Section, Cost of Supply of Miscellaneous Installation Material for All Supplies Along with All Necessary Fitting Accessorie, as Per Specifications, Cost of Supply of Training Manuals Other Documentation in 03 Hard Soft Copies as Per Requirements, Cost of Onsite Training for 08 Aai Nominees for 5 Working Days, Cost of Laying Installation Integration Testing Commissioning of Complete System By Successful as Per Technical Specifications Drawings Qty 3159
|