Pre-Qualification : |
Minimum Average Annual Turnover of the bidder (For 3 Years) (3 ) : 77 Lakh (s) Years of Past Experience Required for same similar service : 3 Year (s) MSE Exemption for Years Of Experience and Turnover : Yes Startup Exemption for Years Of Experience and Turnover : Yes Document required from seller : Experience Criteria,Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
|
Requirement :
|
Supply of Copper Plate, Supply of Pvc Pipe for Watering, Supply of Salt, Supply of Charcoal, Supply of Hdpe Pipes, Supply of Copper Strips, Supply of Multi Str Single Core Pvc Insulated Copper Cable, Supply Installation of Sub Equipotential Earth Bus Bar, Supply Installation of Main Equipotential Earth Bus Bar, Installation Job for Earth Pit Including Inspection Chamber, Installation Laying of Copper Strip for Earth Grid, Installation Laying of Copper Strip From Earth Grid to Building, Installation Laying of Copper Strip From Ups Panel Room at Ground Floor to All the Rooms in All the Floors of the Building Also to the Roof Area of the Building - Sitc of Earthing System for Ats Complex Iatc Tower at Navi Mumbai Airport Qty 19896
|