Pre-Qualification : |
Minimum Average Annual Turnover of the bidder (For 3 Years) (3 ) : 27 Lakh (s) Years of Past Experience Required for same similar service : 3 Year (s) MSE Exemption for Years Of Experience and Turnover : Yes Startup Exemption for Years Of Experience and Turnover : Yes Document required from seller : Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Additional Doc 3 (Requested in ATC),Additional Doc 4 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Past Performance : 80 %
|
Requirement :
|
Supply of Ofc Patch Cord, Supply of Stp Cat-6a Lan Cable, Supply of Wireless Radios, Supply of 24 Port Poe Plus L2 Switch, Server for Radio Link Monitoring with Complete Package, Supply of 1 Gigabit Fptransceiver Modules, Supply of 10 Gigabit Sfp Plus Transceiver Modules, Supply of Dual Port Serial to Ip Converter, Supply of 12 U Racks, Led Display for Radio Link Monitoring, Power Cable, Serial Data Cable, Snmp Monitoring Software Tool, Supply of Frangible Mast 5 Meter, Spd for Rj 45, Spd for Db 9 Connector, Hdpe Conduit Diameter 1 Inch, Hdpe Conduit Diameter 3 Inch, Uv Protected Nylon Cable Ties, H Held Industrial Grade Vacuum Cleaner, Uv Resistant Polyamide Toughened Flexible Conduits, Lan Tester, Lan Io Crimping Tool 02 No, Telescopic Aluminium Ladder with Minimum Expandable Height Up to 6 Meter, Spiral Conduit of Material Ldpe, Self Adhesive Cable Tie Mount, Cost of Laying Installation Integration Testing Commissioning of Complete System By as Per Technical Specifications Drawings - Sitc of Rf Link at Jewar Airport Qty 2477
|