The Project Considers The New Bridge 440 M Downstream Of The Existing One In A Length Of 152 M, Given The Hydraulic And Topographic Requirements. The Geometric Design Of The New Intersection With Rout
Tenders are invited for the project considers the new bridge 440 m downstream of the existing one in a length of 152 m, given the hydraulic and topographic requirements. the geometric design of the new intersection with route 41 - ch is considered, as well as the access to the town of marquesa
Architectural Consultancy Tenders