Supply of 40kva Ups System, Battery Bank, 40 Kva, K13 Isolation Transformer Cubical, Battery Health Monitoring System, Remote Monitoring Control Unit, Supply Laying of 25 Mm Square Copper Power Cables Inside the Ups Rooms From the Ups Rooms to Third Floor Equipment Room in Ats Complex, Supply Laying of 16 Mm Square Copper Power Cables, Supply Laying of 3c X 1 5 Mm Square Copper Single Phase Power Cable at Last Miles, Supply Installation of Isolation Panel, Scada Based, Supply Fixing of Distribution Box, Scada Based, Supply Fixing of 16 a Mccbs, Scada Based Monitoring System, Power Sockets, <br /> Supply Installation Testing Commission of 4 Set of 2x40 Kva Modular Ups System with 1 Year Warranty and 09 Year Camc at Nmial Airport Qty 19511
40kva Ups System,battery Bank,...
Battery and Cell Tenders, Control Panel Tenders, Distribution Board Tenders, Diversified Electrical Spares And Stores Tenders, Monitoring System Tenders, Transformer Tenders, U P S Tenders, Wire And Cable Tenders