Drilling, excavation, loading, transportation, dumping, spreading & levelling etc., of 651.693 lbcm of in-situ overburden (which includes 7.146 lbcm of top soil, 14.292 lbcm of sub soil, 606.245 lbcm of hard ob & 24.010 lbcm of coal), excavation of 13.768 lbcm of top soil from external dump area and re-handling of 3.00 lcm of loose top soil with conventional equipment and additional works viz., 2000 shovel hours, 1500 dozer hours & 40,000 rmt drilling at ktk oc-iii project, bhp area during a period of 36 months.
Drilling, excavation, loading, transportation, dumping, spreading & levelling etc., of 651.693 lbcm of in-situ overburden (which includes 7.146 lbcm of top soil, 14.292 lbcm of sub soil, 606.245 lbcm of hard ob & 24.010 lbcm of coal), excavation of 13.768 lbcm of top soil from external dump area
Dozer Tenders, Drilling Work Tenders, Excavation Work Tenders, Loading Work Tenders, Shovel Tenders, Transportation Work Tenders