Selection of local agency for conducting esia study for the project “construction of a 225 kv (double circuit), 66 kv (multi circuit/double circuit), 33kv (single circuit) transmission lines and associated substations in sierra leone (exim bank funded)”.
Selection of local agency for conducting esia study for the project “construction of a 225 kv (double circuit), 66 kv (multi circuit/double circuit), 33kv (single circuit) transmission lines and associated substations in sierra leone (exim bank funded)”.
Circuit Breakers/Fuse Tenders, Consultancy Service Tenders, Transmission Line Tenders