Execution of various p-way works in connection with "through sleeper renewal (primary) for a length of 2.290 tkm from km.343.000 to 345.290 & 2.525 tkm from km345.625 to 350.587 on up line between rayagada - ladda stations, 2.555tkm from km.375.758 to 378.313 on down line between gumada - parvatipuram stations, 2.467tkm between from km402.370 to 403.397 on up line, 402.399 to 402.854, 403.000 to 403.985 on down line between sitanagaram - bobbili stations & 2.494 tkm from km 413.452 to 414.900 on up line & 413.564 to 414.610 down line between bobbili - donkinavalasa stations, through rail renewal (primary) of existing 60kg 90uts rails with new 60kg 110 uts rails for a length of 2.050 tkm from km 377.900 to km 379.950 on down line between gumada - parvatipurm stations, 2.038tkm from km.407.102 to 409.140 dn line, 1.399 tkm from km415.228 to 425.294 on down line and to 425.307 up line between sitanagaram and bobbili stations & from km.413.518 to 415.518 on down line between bobbili - donkinavalasa stations and through fitting renewal for a length of 8.123 tkm between singapur road to donkinavalasa stations in patches on raipur - vizianagaram line under the jurisdiction of
Execution of Various P-way Works in Connection with "th......
Track Work Tenders