Construction of 200 cum capacity rcc elevated reservoir, 20 mtrs. staging height at the head works site (zn-ii) including distribution system all zones (hdpe) with rising main, rig bore 3 nos. big dia tw by odex-165 for aug. of barsadvita pwss.
PHE/SWSD/EE/NIeT-47 of 22-23 Sl. No. 09(2nd Call) #*. Construction of 200 cum capacity RCC Elevated Reservoir, 20 mtrs. Staging Height at the head works site (Zn-II) including distribution system all zones (HDPE) with Rising Main, Rig bore 3 nos. big dia TW by Odex-165 ......for Aug. of BARSADVITA
Bore Well Tenders, Pipeline Project Tenders, Reservoir Tenders