Drilling, Excavation, Loading, Transportation, Dumping, Spreading & Levelling, Etc., of 602.58 Lbcm of In-situ Ob (which Includes 4.08 Lbcm of Top Soil, 569.92 Lbcm of Hard Ob & 28.58 Lbcm of Coal) and Re-handling of 15.28 Lcm of Top Soil with Conventional Equipment and Additional Works Viz., 3, 000 Rmt of Drilling at Rg Ocp-iii Mine (phase-ii), Rg-ii Area During a Period of 36 Months.
Drilling, Excavation, Loading, Transportation, Dumping, Spreading & Levelling, Etc., of 602.58 Lbcm of In-situ Ob (which Includes 4.08 Lbcm of Top Soil, 569.92 Lbcm of Hard Ob & 28.58 Lbcm of Coal) and Re-handling of 15.28 Lcm of Top Soil with Conventional Equipment and Additional Works Viz., 3,
Drilling Work Tenders, Excavation Work Tenders, Labour Work Tenders, Land Levelling Tenders, Loading Work Tenders, Material Handling Plant Tenders, Transportation Work Tenders