(A) Providing & Laying RCC NP-3 S&S Pipe inside HDPE lining, UPVC pipe sewer, Const. of MPS, Pumping Machinery, Rising Main & all other Works contingent thereto at Kot Shamir Distt. Bathinda (Under SBM-02) (B) Construction of 2 MLD Cap. STP cum 6 KLD FSTP at Kot Shamir Distt. Bathinda based on suitable Proven sustainable Biological technology on turnkey basis including 0&M for 60 months after stabilization period 3 months (Under SBM-02). Distt. Bathinda based on suitable Proven sustainable Biological technology on turnkey basis including 0&M for 60 months after stabilization period 3 months (Under SBM-02).
(A) Providing & Laying RCC NP-3 S&S Pipe inside HDPE lining, UPVC pipe sewer, Const. of MPS, Pumping Machinery, Rising Main & all other Works contingent thereto at Kot Shamir Distt. Bathinda (Under SBM-02) (B) Construction of 2 MLD Cap. STP cum 6 KLD FSTP at Kot Shamir Distt. Bathinda based on
Laying Pipe Tenders, Pipeline Project Tenders, Pump Tenders, R C C Pipe Tenders, Sewage Treatment Plant Tenders, Sewerage Line Tenders