Part (A) -Providing & Laying of RCC NP-3 Pipe with HDPE lining, UPVC pipe sewer, MPS Including pumping Machinery, DI K-7 R/M and all others Works contingent thereto at Kotha Guru Ka as per DNIT (SBM-2.0). Part-B Survey, Soil Testing, Design, Supply and Const., Commissioning of 2 MLD capacity STP cum 6 Kld FSTP based on Suitable Proven Sustainable Biological technology including other appurtenant Works on turnkey basis as per DNIT including 0&M for a period of 60 months after stabilization period of 3 months (SBM-2.0).
Part (A) -Providing & Laying of RCC NP-3 Pipe with HDPE lining, UPVC pipe sewer, MPS Including pumping Machinery, DI K-7 R/M and all others Works contingent thereto at Kotha Guru Ka as per DNIT (SBM-2.0). Part-B Survey, Soil Testing, Design, Supply and Const., Commissioning of 2 MLD capacity STP
Architectural Consultancy Tenders, Civil Work Tenders, Laying Pipe Tenders, Pump Tenders, R C C Pipe Tenders, Sewage Treatment Plant Tenders, Sewerage Line Tenders, Soil Investigation Tenders, Survey Work Tenders