Construction of new 4 lane major bridge with approaches on Sabarmati River near Dharoi at Km. 82/00 to 86/00 (Design length 3.300 km) on NH58 in the state of Gujarat on HAM
Construction of new 4 lane major bridge with approaches on Sabarmati River near Dharoi at Km. 82/00 to 86/00 (Design length 3.300 km) on NH58 in the state of Gujarat on HAM #*. Construction of new 4 lane major bridge with approaches on Sabarmati River near Dharoi at Km. 82/00 to 86/00 (Design
Bridge Tenders, Road Tenders