Design and Construction of Elevated Metro Viaduct of Length 17.624 Km Between Ch 21256.814 to Ch. 38881.7 Including Railway Spans of Length 79m & 100m and 6 Lane Double – Decker Road Bridge / Flyover of Length 1.027 Km on National Highway Between Ch 22873.8 to Ch 23900.777 as Well as a 6 Lane Vehicular Underpass (VUP) from Ch. 25755.211 to 26895.211 for a Total Length of 1.14 Km in Reach 1a F NMRP Phase 2.
Design and Construction of Elevated Metro Viaduct of Length 17.624 Km Between Ch 21256.814 to Ch. 38881.7 Including Railway Spans of Length 79m & 100m and 6 Lane Double – Decker Road Bridge / Flyover of Length 1.027 Km on National Highway Between Ch 22873.8 to Ch 23900.777 as Well as a 6 Lane
Architectural Consultancy Tenders, Bridge Tenders, Road Tenders, Tunnel Work Tenders