Construction of basic infrastructure of international level for industrial area at Adityapur region (Adityapur Industrial Area phase-IV) (Total Length 6.271 Km.) for the year 2023-24.
Construction of basic infrastructure of international level for industrial area at Adityapur region (Adityapur Industrial Area phase-IV) (Total Length 6.271 Km.) for the year 2023-24.
Civil Work Tenders