Extraction of 7.20 Lakh Tonnes (LT) of coal over a period of 5 APPs on cost per tonne basis by using intermediate technology i.e. drilling, blasting and loading with suitable capacity of SDLs at Under ground mine of KTK OC III Project, Bhupalpalli Area, SCCo.Ltd.
Extraction of 7.20 Lakh Tonnes (LT) of coal over a period of 5 APPs on cost per tonne basis by using intermediate technology i.e. drilling, blasting and loading with suitable capacity of SDLs at Under ground mine of KTK OC III Project, Bhupalpalli Area, SCCo.Ltd.
Arms/Ammunation Equipment Tenders, Drilling Work Tenders, Labour Work Tenders, Loading Work Tenders