Supply of De-centralized Materials Stone pad, X-arms holding clamps with bolts & nuts for ST/PCC poles, F-bracket with bolts & nuts for ST/PCC poles, Al. binding wire, M.S clamp for Top, T-off channel with bolts & nuts for ST/PCC poles, Guarding Angle Clamps for ST/PCC poles, P.G clamps for weasel conductor, Danger board with clamp & bolts for ST/PCC poles, Barbed wire GI, E-bracket with bolts & nuts, 160 mm OD PN-4 PE-80 Grade UV stabilized HDPE Pipe, Jointer for G.I pipe etc for Capacity Enhancement of 11/0.4 kV substation & Construction and bifurcation of 11 kV line Mirzapur in availability of B.P 2024-25 Under EDD-I.
Supply of De-centralized Materials Stone pad, X-arms holding clamps with bolts & nuts for ST/PCC poles, F-bracket with bolts & nuts for ST/PCC poles, Al. binding wire, M.S clamp for Top, T-off channel with bolts & nuts for ST/PCC poles, Guarding Angle Clamps for ST/PCC poles, P.G clamps for weasel
Bolts And Nuts Tenders, Fasteners Tenders, Hook Tenders, Pcc Poles Tenders, Pipe- Plastic Tenders, Road Furniture Tenders, Sub Station Tenders, Transmission Line Tenders, Wire And Cable Tenders