Construction of Viaduct Portion of Elevated Corridor, ROBs (except steel spans) and Exit/Entry Ramps, SVUP, LVUPs, VUPs, PUPs, construction / reconstruction / widening of Culverts, NHAI <span style="colorblack; background-color <br />ffdfba;">Office Buildingspan>, other miscellaneous works, including electrification & lighting (except design, supply, fabrication & launching of <span style="colorblack; background-color <br />FFB3BA;">steel <span style="colorblack; background-color <br />FFB3BA;">bridgespan>span> spans, RE Wall, <span style="colorblack; background-color <br />b3dee2;">road workspan>, diversion, intersections, utility shifting etc), in connection with construction of Six Lane Elevated Kona Expressway from Ch. 0.145 KM to 7.337 KM of NH 117 in the State of West Bengal on EPC mode
Construction of Viaduct Portion of Elevated Corridor, Robs (except Steel Spans) and Exit/entry Ramps, Svup, Lvups, Vups, Pups, Construction / Reconstruction / Widening of Culverts, Nhai Office Building, Other Miscellaneous Works, Including Electrification & Lighting (except Design, Supply,
Bridge Tenders, Building Tenders, Civil Work Tenders, Culvert Work Tenders, Electrical Work Tenders, Fabrication Work Tenders, Light and Bulb Tenders, Road Tenders, Wall Tenders