Provision of safety fencing with W-beam metal barriers alongside the track for a length of 63.4 km in connection with the work of increasing sectional speed from 110 kmph to 130 kmph. Maintenance period of 12 months.
Provision of safety fencing with W-beam metal barriers alongside the track for a length of 63.4 km in connection with the work of increasing sectional speed from 110 kmph to 130 kmph. Maintenance period of 12 months.
Fencing Work Tenders, Road Furniture Tenders