Satisar Cooperative Group Housing Society Limited
Live Tenders   Archive Tenders
1.
Company Name Satisar Cooperative Group Housing Society Limited
Location Dwarka  
Last Date 30 October 2016
Est. Cost INR 30,000,000.00
Additional and Alteration Works -Dismantling works, Flooring work, RCC works, masonry work, wood work/steel work/aluminum work, finishing, miscellaneous works - Supply and Fixing of pvc conduit, Fan Box (metal), Copper Wiring of 2.5 Sqmm, Wiring accessories, Switch Sockets, Back boxes, as reqd. (PVC conduit of make AKG/BEC. Copper wiring of make KEI / Havells, Switch / Sockets Crabtree Ithena), Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracing, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete in all respects The elevation area of the scaffolding shall be measured for payment purpose The payment will be made once irrespective of duration of scaffolding.(To be considered upto 10 Storey height.), Providing and Laying uPVC pipes 6kg/cm2 class III (IS4985-1983) including injection molding fittings where required e.g. tees, bends, coupling & adapter and jointing with adhesive approved by fittings manufactures including necessary MS clamps of 400mm x 5mm thick flat, cutting chases holes in bricks & R.C.C. wall and making good the same with cement concrete 124 (1cement 2coarsesand 4grade stone aggregate 20mm nominal size) finished smooth for rain water pipe. (110mm dia pipe), Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracing, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen. Complete in all respects The elevations area of the scaffolding shall be measured for payment purpose The payment will be made once irrespective of duration of scaffolding.( At all floors and at every level till Terrace., Providing and Laying uPVC pipes 6kg/cm2 class III (IS4985-1983) including injection molding fittings where required e.g. tees, bends, coupling & adapter and jointing with adhesive approved by fittings manufactures including necessary MS clamps of 400mm x 5mm thick flat, cutting chases holes in bricks & R.C.C. wall and making good the same with cement concrete 124 (1cement 2coarsesand 4grade stone aggregate 20mm nominal size) finished smooth for rain water pipe. (110mm dia pipe), Dismantling Work. ,