Construction of head quarter building 03 basements ground 11 floors for central reserve police force composite structure on epc basis at cgo complex.
Civil works including internal water supply and sanitary installations sewerage system, drainage and development of site electrical works including internal electrical installations fire fighting fire alarm system air conditioning lifts stp sub station dg sets cc tv access control system and solar photo voltaic power generation system and solar heating system audio video system ibms system lan etc external development works horticulture works and other miscellaneous works.
Civil works including internal water supply and sanitary installations sewerage system, drainage and development of site electrical works including internal electrical installations fire fighting fire alarm system air conditioning lifts stp sub station dg sets cc tv access control system and solar photo voltaic power generation system and solar heating system audio video system ibms system lan etc external development works horticulture works and other miscellaneous works.
Classified in :
#Air Conditioner
#Local Area Network
#Sewage Treatment Plant
#Development Work
#Sewerage System Repair
#Audio Video Equipment
#Heating System
#Solar Heating System
#Sanitary Installation Repair
#Fire Alarm System
#Lift Repair
#Site Development
#Horticulture Work
#Fire Fighting Equipment
#Drainage
#Water Supply Work
#Electrical Work
#Building
#Civil Work
#Electrical Installation
#Server
#Quarter
Partner Opportunity



Key Value